Tag: TfGM

Image credit: TfGM. Sent in press release. Safe to use

Eccles Metrolink line set to reopen 16th August after completion of safety-critical engineering works

The Eccles line was closed on Monday 19th July to enable access to two sections of the track to replace them.  The replacements were supposed to be completed over a two-week period was extended for a month, but it became evident that an additional concrete renewal alongside the track replacement was required after the tram track […]